PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued layout gravel the Rooms (133-136) Facing North-West (800x600).jpg Poured concrete at the trench drains Facing West (1) (800x600).jpg Poured concrete at the trench drains Facing West (2) (800x600).jpg Started construction the diamong boxes for the steel columns (800x600).jpg Finished installing hand rails at Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installing elevator beams at Elev. 1,2,3 (2nd Floor) Facing East (800x600).jpg Welding Embeds at the pour stops around the 2nd Floor Facing North (800x600).jpg
Previous pageNext page Poured concrete at the trench drains Facing West (2) (800x600)
Poured concrete at the trench drains Facing West (2) (800x600)